Serving buyers in the USA, Canada and MexicoManufacturing in Mexico and ChinaU.S. +1 619 802 6261

QUALITY MANAGEMENT

Quality planning begins before production starts

Createch integrates incoming inspection, process controls, validation and final inspection into each program according to product risk and customer requirements.

Management standards for quality and environmental control

Certification scope may differ by operating location. The Createch team confirms the applicable site and documentation during program review.

IATF 16949:2016

Automotive quality-management requirements supporting disciplined planning, process control and continuous improvement.

ISO 9001:2015

Quality-management systems used to control documented processes, responsibilities and corrective actions.

ISO 14001:2015

Environmental-management practices supporting controlled operations and regulatory compliance.

Program-specific verification

Createch reviews customer drawings, validation plans and documentation requirements before production launch.

Documentation and inspection matched to program needs

  • PPAP Level 3 documentation
  • Process flowcharts and control plans
  • FMEA and risk review
  • Dimensional inspection reports
  • Measurement system analysis and R&R
  • Capacity studies
  • Statistical process control
  • Incoming material inspection
  • In-process and final inspection
  • IMDS delivery support

Measurement and reliability equipment

Dedicated quality labs support dimensional, cleanliness, environmental and functional checks.

Available equipment includes CMM and optical measurement systems, cleanliness testing, constant-temperature ovens, electronic load testing, soundproof-room testing, gauges and other program-specific inspection equipment. The exact control plan depends on the part, drawing and customer requirements.